8,000 MW of Renewables Authorized in 2025—But Where Will Industry Plug In?

2026-01-30T12:37:27+01:00

According to the latest report by Opina 360’s Renewable Energy Observatory, Spain authorized 8,194.5 MW of renewable capacity in 2025, 69% less than the previous year. We have designed a system to pour energy into the grid, but not necessarily for in [...]

8,000 MW of Renewables Authorized in 2025—But Where Will Industry Plug In?2026-01-30T12:37:27+01:00

New “Green Plugs” to Power Reindustrialization

2025-04-16T12:14:30+02:00

April 16, 2025 The geographic distribution of energy generation will be key for the green reindustrialization process: Are renewables located where they need to be? A strategic national and regional planning approach is essential, one that actively l [...]

New “Green Plugs” to Power Reindustrialization2025-04-16T12:14:30+02:00

How to Prevent an Energy Heart Attack: Keys to Sustaining the Industrial Pulse

2025-03-14T13:10:33+01:00

The MITECO recognizes industry as a priority in the new cycle of electrical planning and has opened a public consultation on aid, which includes a specific section for “installation and integration costs, mainly for industry.” Measures must be taken [...]

How to Prevent an Energy Heart Attack: Keys to Sustaining the Industrial Pulse2025-03-14T13:10:33+01:00

Can the Spanish Industry Be (More) Electric?

2025-03-11T13:26:05+01:00

https://www.youtube.com/watch?v=h9JZWhjQDvc "She's electric, can I be electric too?" - Oasis This question, posed by Oasis in their iconic 1995 song, resonates today more than ever in the Spanish industrial landscape. If electricity were a muse, our [...]

Can the Spanish Industry Be (More) Electric?2025-03-11T13:26:05+01:00
Go to Top